November 8, 2017 I missed two work sessions in October so I may miss some work activities. I went out to Ohio to meet with the owner of our future tool car. While there I met the mechanic who will be performing the initial work on the car prior to its trip to Albuquerque. The […]

TW3

November 8, 2017

Work Session Status Week Ending 11/04/2017

October 17, 2017 This past week we were able to stop the leak on the main steam valve on the turret. It was hoisted into place atop the locomotive. The four saturated steam pipes from the steam dome to the turret were also lifted up. They will be permanently installed this week. Small bore piping […]

TW3

October 17, 2017

Work Session Status Week Ending 10/14/2017

October 9, 2017 New small bore piping is being bent and installed for the stack lifter and sander check valves. These pipes were under the jacketing and had wasted away. Two MU jumper boxes were installed along with the MU cable which was threaded down through its conduit. Work on the fuel line began Saturday […]

TW3

October 9, 2017

Work Session Status Week Ending 10/07/2017

October 5, 2017 It has been awhile since I’ve provided a TW3 report. Since this last report Madame Secretary and I took a couple weeks which should have been some R & R, but was intermingled with several calamities. Upon our return the open house preparations began along with the open house itself and work […]

TW3

October 5, 2017

Work Session Status Week Ending 09/30/2017

September 4, 2017 This week preparations are being made to reinstall the blast pipe after it was moved out of the way. A bore scope camera was used to look into the steam cylinder passages to the blast pipe. Several rocks were seen and removed from them. An old rag was also found in one […]

TW3

September 4, 2017

Work Session Status Week Ending 09/02/2017

August 28, 2017 Last week we removed the blast pipe for cleaning and inspection. None of the nuts were, to say the least, cooperating as they were subjected to the blue torch wrench for removal. If that wasn’t bad enough all the special shaped bolts were rust frozen in place. Hammers were used to unseat […]

TW3

August 28, 2017

Work Session Status Week Ending 08/26/2017

August 22, 2017 I have a few items to reveal this week. Our firebrick crew formed around the combustion air inlet tubes and put in place the castable refractory around them.​ Repairs are needed at the floor inlet box as much of the metal has wasted and is very thin. Replacement plates were cut Saturday […]

TW3

August 22, 2017

Work Session Status Week Ending 08/19/2017

August 14, 2017 A few weeks ago test plugs were fabricated for the superheater header to be installed in place of the superheater bundles. This enabled us to pressure test each vertical column of superheaters as they are installed insuring we have a good seal on each bundle. Our crew has been hard at work […]

TW3

August 14, 2017

Work Session Status Week Ending 08/12/2017

August 2, 2017 Since our successful hydrostatic boiler test workers have been inserting superheater bundles on each side of the boiler leaving a work area in the middle. We had superheater header plugs fabricated so as each column of superheater bundles can be tested for leaks before moving on to the next column. After testing […]

TW3

August 2, 2017

Work Session Status Week Ending 07/29/2017

July 11, 2017 It has been a while since I wrote a TW3, mostly due to the many photos available on our website and Facebook. After all you know what they say, “a picture is worth a thousand words!” Anyway, there needs to be a written account of activities ​from time to time. Our air […]

TW3

July 11, 2017

Work Session Status Week Ending 07/08/2017